and at the time of the building of the Millennium Tower in Rotterdam, Omega was part of a so-called 'design and build' commission, i.e. a project which we both designed and realised. When the plan was ready, two Omega mechanics set out to install a complete grounding installation, a potential compensation and a lightning protection installation on a floor area of 28,000 m2. The duration of this large project was 14 months.
|
 |
|
Scattered over the entire Netherlands are distribution boxes of KPN Telecom. Twenty Omega mechanics were busy for 6 months to install and finish lightning grounding at these boxes. At the same time, it was no trouble at all for them to do some small repairs. |
 |
|
Omega regularly does work for private persons also. For example: two mechanics installed an external lightning protection system on a villa with a thatched-roof in Borger. Rain pipes were used to install the descending wiring out of sight as much as possible. |
 |
|
During a period of seven weeks, two Omega mechanics installed a lightning protection system and metallic connections on flue gas ducts for the Physics faculty of Groningen University. |
 |
|
The cable company Castel Groningen asked Omega to install and finish a safety grounding at the CAI boxes in the northern provinces. A job one of our mechanics finished in six months. |
 |
|
Following European regulations, the lead water pipes in the Netherlands are for health reasons being replaced by plastic pipes. After such a conversion, new safety grounding is necessary. Omega was commissioned to install ground electrodes in various regions. |
 |
|
Omega does not like poor work and offers extra afterservice with periodical inspections and maintenance, such as the annual inspection to the lightning safety installations on the Rotterdamse Schouwburg. |
|